| In just a few day's time, additional lighting fixtures have been installed, and shelving is now in place. |
| The Teen Room is getting taped and mudded this morning. The wooden slat ceiling has already been installed. |
| Teen ceiling and lighting |
| New shelving in the Adult room, and a built in shelf for our library catalog computer were just installed at the far end of the room. |
| Look at the great details in the reading nook at the back of the Adult wing. It features a working fireplace, gorgeous trifold doors and refinished windows. |
| The windows are all getting a great sanding and staining treatment, as are the original bookcases. What a difference! |
| The other functional fireplace in the branch. There will be magazines, newspapers, and comfortable seating in this area. |
| This photo shows the flexible space at the far end of the Children's area. The lighting has been hung, and the folding door installed. |
| Final ceiling tiles are being placed in the staff work room. |
| The library entrance! The ramp will be to the left, and the new glass doorway will be grand. |
| An updated view of the bioswale on the Ashby side of the building |